Design for green lean building module production - Case study
Artikel i vetenskaplig tidskrift, 2018

With an increasing societal need for temporary buildings, while construction industry faces resource and time efficiency challenges, factory assembly of modular buildings can be a solution. This case study at a start-up company uses experiences from assembly system design and eco-design literature to propose green lean design principles to be used in the design and development of building modules and their assembly stations. The eco-design strategy wheel is used as a basis and adapted for the assessment of green and lean building manufacturing.

eco-design

modular building production

grean-lean

Författare

Martin Kurdve

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

Jutta Hildenbrand

Swerea IVF AB

Christina Jönsson

Swerea IVF AB

Mälardalens högskola

Procedia Manufacturing

2351-9789 (eISSN)

Vol. 25 594-601

CONSTRUCTIVATE. Hur kan hanteringen av bygg- och rivningsavfall förbättras?

Stiftelsen Chalmers Industriteknik, 2016-04-01 -- 2019-12-31.

CiMMREC – Circular models for mixed and multi material recycling in manifacturing extended loops

RISE ivf, 2016-08-01 -- 2020-03-01.

Ämneskategorier

Arkitekturteknik

Produktionsteknik, arbetsvetenskap och ergonomi

Design

Styrkeområden

Produktion

DOI

10.1016/j.promfg.2018.06.096

Mer information

Senast uppdaterat

2019-03-07