Design for green lean building module production - Case study
Artikel i vetenskaplig tidskrift, 2018

With an increasing societal need for temporary buildings, while construction industry faces resource and time efficiency challenges, factory assembly of modular buildings can be a solution. This case study at a start-up company uses experiences from assembly system design and eco-design literature to propose green lean design principles to be used in the design and development of building modules and their assembly stations. The eco-design strategy wheel is used as a basis and adapted for the assessment of green and lean building manufacturing.

grean-lean

eco-design

modular building production

Författare

Martin Kurdve

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

Jutta Hildenbrand

Swerea IVF AB

Christina Jönsson

Swerea IVF AB

Mälardalens högskola

Procedia Manufacturing

2351-9789 (eISSN)

Vol. 25 594-601

Ämneskategorier

Arkitekturteknik

Produktionsteknik, arbetsvetenskap och ergonomi

Design

DOI

10.1016/j.promfg.2018.06.096

Mer information

Skapat

2018-09-18