Multiobjective Long-Period Optimal Planning Model for a Grid-Connected Renewable-Battery System
Journal article, 2022
total curtailed energy (TCE)
grid dependence (GD)
optimal sizing
Cost of electricity (COE)
long-period operation
practicality
Author
Rahmatollah Khezri
Chalmers, Electrical Engineering, Electric Power Engineering
Flinders University
Amin Mahmoudi
Flinders University
Hirohisa Aki
University of Tsukuba
IEEE Transactions on Industry Applications
0093-9994 (ISSN) 1939-9367 (eISSN)
Vol. 58 4 5055-5067Subject Categories
Energy Engineering
Energy Systems
Other Electrical Engineering, Electronic Engineering, Information Engineering
DOI
10.1109/TIA.2022.3167010