Optimization for Roads' Construction: Selection, Prioritization, and Scheduling
Journal article, 2018

Limited resources (budget, labor, machinery) have a significant toll on the roads' construction. The question of interest is: given variations of resources over a lengthy construction time, what would be the best construction scheduling plan, or how to optimize the Gantt chart while considering two highly challenging features (1) prerequisite conditions and (2) the interdependency of the benefit of the projects’ completions. We formulate it as a bilevel problem where the objective function is to minimize generalized costs and the lower level accounts for the drivers’ route choice. We employ a solution algorithm based on a supervised learning technique (a linear regression model of machine-learning) and an integer programming problem and it is applied to the datasets of Winnipeg and Chicago. The regression model was found to be a tight approximation which resulted in an efficient algorithm (the CPU time is almost a linear function of the number of iterations). Moreover, the proposed methodology can render promising results (at least locally optimal solutions). This article is the first to formulate the Gantt chart using linear binary constraints and optimize it tailored to real-life case studies.

Author

Saeed Asadi Bagloee

University of Melbourne

Majid Sarvi

University of Melbourne

Michael Patriksson

Chalmers, Mathematical Sciences, Applied Mathematics and Statistics

Mohsen Asadi

University of Saskatchewan

Computer-Aided Civil and Infrastructure Engineering

1093-9687 (ISSN) 1467-8667 (eISSN)

Vol. 33 10 833-848

Areas of Advance

Transport

Subject Categories

Computational Mathematics

Control Engineering

Computer Science

DOI

10.1111/mice.12370

More information

Latest update

10/11/2018