Strategic Approach to Cogeneration Design
Paper i proceeding, 2005

When considering the installation of a co-generation facility in a Kraft pulp mill, it is important that one first perform a mill energy efficiency study and set tactical targets with regard to energy projects/opportunities prior to specifying the co-generation plant design specifications. For the best case, the Simple Payback Period is reduced from 5.4 to 2.5 years when energy consumption is reduced before installing co-generation. Also, on-site GHG emissions can be reduced if such an energy efficiency study is performed before installing co-generation.

Författare

Thore Berntsson

Industriella energisystem och tekniker

K Riemer

Paul Stuart

Proceedings - Pulp and Paper Technical Association of Canada (PAPTAC) 91st Conference, 7-9 Feb. 2005

699-704

Ämneskategorier

Energiteknik

Mer information

Skapat

2017-10-06