A review of the Namntall Tunnel project with regard to grouting performance
Artikel i vetenskaplig tidskrift, 2010

The 6 km tunnel under the Namntall hill is a part of the Botniabanan railway project in northern Sweden. The tunnels were excavated by means of drilling and blasting and with, for Scandinavian conditions, a normal grouting routine. The grouting is performed to reduce water ingress into the tunnel to the level defined in the contract. When the water ingress requirements proved difficult to meet, it was obvious that the geological and the hydrogeological conditions in the tunnel would dictate the work processes. A distinctive change in rock conditions influenced both grouting performance and seepage into the tunnel. The rock conditions and the grouting were quantified throughout the project and these are summarized in this paper. It can be concluded that the strongest correlation is between the water ingress, the hydrogeological conditions and the density of the zones and the conditions in and around these zones. The paper suggests a different approach to hydrogeological prognosis and the grouting process, such as distribution of grouting classes, increased mixer capacities and regular use of two grouting rounds. (C) 2010 Elsevier Ltd. All rights reserved.

Inflow

Grouting

Zones

Fractured rock

Case study

Författare

Björn Stille

Chalmers, Bygg- och miljöteknik, Geologi och geoteknik

Gunnar Gustafson

Chalmers, Bygg- och miljöteknik, Geologi och geoteknik

Tunnelling and Underground Space Technology

0886-7798 (ISSN)

Vol. 25 4 346-356

Ämneskategorier

Samhällsbyggnadsteknik

DOI

10.1016/j.tust.2010.01.009

Mer information

Senast uppdaterat

2019-07-22