Improved Cost-Benefit Analysis for Market-Based Transmission Planning, A European Perspective
Artikel i vetenskaplig tidskrift, 2013

This paper addresses the problem of transmission planning in interconnected power systems under the uncertainty of future generation parks and fast varying marginal production costs. The decision maker has to consider many different aspects during the denition of dierent transmission planning strategies, that sometimes might even be contradicting. Major contributions are the incorporation of energy policy measurements in the evaluation process of candidate transmission plans and the inclusion of short and long-term uncertainties. The proposed methodology, so called C-TRAP, is based on a semi-dynamic heuristic approach, that solves the social welfare maximization problem for several discrete steps considering different preferences for energy policy and transmission network reinforcements. The flexibility provided through the heuristic analysis is very important for decision makers in the new uncertain environment in power systems.

Future electric power systems

uncertain transmission

Författare

Papaemmanouil Antonis

Eidgenössische Technische Hochschule Zürich (ETH)

Lina Bertling

Chalmers, Energi och miljö, Elkraftteknik

Anh Tuan Le

Chalmers, Energi och miljö, Elkraftteknik

Göran Andersson

Eidgenössische Technische Hochschule Zürich (ETH)

Energy Policy

0301-4215 (ISSN)

Vol. 63 215-223

Styrkeområden

Energi

Ämneskategorier

Annan elektroteknik och elektronik

DOI

10.1016/j.enpol.2013.08.066

Mer information

Senast uppdaterat

2018-11-05