BIM from Design to Production: Prerequisites for a Model-Based Construction Framework with Total BIM
Övrigt konferensbidrag, 2025
This study uses two projects to develop the framework for enabling Model-based construction, a hospital project and an Office extension and renovation project. While the hospital case demonstrated effective alignment between model development and site execution, the office case revealed limitations under traditional procurement. Findings support the need for integrated process architectures and suggest that Virtual Design and Construction (VDC) can serve as a coordinating logic for combining digital tools, planning strategies, and quality systems into a coherent delivery framework.
TQM
BIM
MMI
VDC
LOIN
Författare
Mikael Viklund Tallgren
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Efraim Ljung
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Oliver Disney
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Mikael Johansson
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Mattias Roupé
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Kapstaden, South Africa,
Fas 2: Total BIM – En förutsättning för digital tvilling av byggprojekt
Svenska Byggbranschens Utvecklingsfond (SBUF) (14394), 2024-06-30 -- 2026-12-31.
Digital Twin Cities Centre, 2024-06-30 -- 2029-12-31.
BIM baserad virtuell taktplanering
Centrum för management i byggsektorn (CMB) (211), 2023-08-06 -- 2025-12-30.
Svenska Byggbranschens Utvecklingsfond (SBUF) (14237), 2023-08-06 -- 2025-12-30.
Ämneskategorier (SSIF 2025)
Byggprocess och förvaltning