A hybrid hydro-ess simulation model to meet fcr-d requirements
Artikel i vetenskaplig tidskrift, 2026

In 2023, the technical requirements for frequency containment reserve-disturbance (FCR-D) in the Nordic synchronous area were revised, introducing stricter demands on dynamic response and new stability criteria. Hydropower plants (HPPs) constitute the largest share of FCR-D provision in the Nordic region. However, HPPs exhibit inherent dynamic delays, which may prevent some units from complying with the revised requirements. A hybrid solution with a fast-Acting energy storage system (ESS) is therefore proposed to assist the HPP, enabling the hybrid plant to fulfil the requirements for FCR-D. This paper models a Kaplan HPP in Sweden which fails to meet the revised FCR requirements on its own. A dynamic parallel power sharing strategy between the HPP and ESS for primary frequency control within a hybrid power plant is proposed. Both battery energy storage system and supercapacitor energy storage system are considered for the hybrid plant, and the most cost-effective configuration is explored.

Hydro Power

Hybrid Power Plant

Energy Storage System

Författare

Joel Gerdes

Solvina AB

Christian Ekstrand

Solvina AB

Peiyuan Chen

Chalmers, Elektroteknik, Elkraftteknik

Victor Lidskog

Solvina AB

Eddie Eriksson

Solvina AB

IET Conference Proceedings

27324494 (eISSN)

Vol. 2026 5 42-49

Styrkeområden

Energi

Ämneskategorier (SSIF 2025)

Energiteknik

Energisystem

Elkraftsystem och -komponenter

DOI

10.1049/icp.2026.2325