Circular construction logistics for retaining value of waste material in new build projects
Paper in proceeding, 2024

The construction industry is the largest contributor of waste in the EU, and research shows that a high sorting rate does not automatically entail a high recycling rate. The purpose of this study is, through a multiple case study, to provide better understanding of the waste flows and the prerequisites on the logistical operations within new build construction projects, considering the variation over time (construction phases). Waste data from five projects were analyzed. Results show that amount and mix of waste varieties vary considerably during a project, which has to be effectively managed by the waste logistics system.

Resource utilization

Construction logistics

Waste flows

Author

Amanda Åkerberg

Ragn-Sells

Nicolas Brusselaers

Linköping University

Mats Johansson

Chalmers, Technology Management and Economics, Supply and Operations Management

Proceedings of 31st EurOMA Conference

31st EurOMA Conference
Barcelona, Spain,

Construction logistics for increased resource utilization and transport efficiency

VINNOVA (2023-00519), 2023-05-08 -- 2025-07-03.

Subject Categories

Mechanical Engineering

Driving Forces

Sustainable development

Areas of Advance

Transport

More information

Created

11/2/2024