Circular construction logistics for retaining value of waste material in new build projects
Övrigt konferensbidrag, 2024

The construction industry is the largest contributor of waste in the EU, and research shows that a high sorting rate does not automatically entail a high recycling rate. The purpose of this study is, through a multiple case study, to provide better understanding of the waste flows and the prerequisites on the logistical operations within new build construction projects, considering the variation over time (construction phases). Waste data from five projects were analyzed. Results show that amount and mix of waste varieties vary considerably during a project, which has to be effectively managed by the waste logistics system.

Construction logistics

Resource utilization

Waste flows

Författare

Amanda Åkerberg

Ragn-Sells

Nicolas Brusselaers

Linköpings universitet

Mats Johansson

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

31st EurOMA Conference
Barcelona, Spain,

BÖRjA (Bygglogistik för ökad resurshushållning och transporteffektivitet genom aktörssamverkan )

VINNOVA (2023-00519), 2023-05-08 -- 2025-07-03.

Ämneskategorier (SSIF 2011)

Maskinteknik

Drivkrafter

Hållbar utveckling

Styrkeområden

Transport

Mer information

Senast uppdaterat

2025-01-31