Circular construction logistics for retaining value of waste material in new build projects
Paper i proceeding, 2024

The construction industry is the largest contributor of waste in the EU, and research shows that a high sorting rate does not automatically entail a high recycling rate. The purpose of this study is, through a multiple case study, to provide better understanding of the waste flows and the prerequisites on the logistical operations within new build construction projects, considering the variation over time (construction phases). Waste data from five projects were analyzed. Results show that amount and mix of waste varieties vary considerably during a project, which has to be effectively managed by the waste logistics system.

Resource utilization

Construction logistics

Waste flows

Författare

Amanda Åkerberg

Ragn-Sells

Nicolas Brusselaers

Linköpings universitet

Mats Johansson

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

Proceedings of 31st EurOMA Conference

31st EurOMA Conference
Barcelona, Spain,

BÖRjA (Bygglogistik för ökad resurshushållning och transporteffektivitet genom aktörssamverkan )

VINNOVA (2023-00519), 2023-05-08 -- 2025-07-03.

Ämneskategorier

Maskinteknik

Drivkrafter

Hållbar utveckling

Styrkeområden

Transport

Mer information

Skapat

2024-11-02