Mathematical optimization of a flexible job shop problem including preventive maintenance and availability of fixtures
Paper i proceeding, 2012

The multitask cell at Volvo Aero Corporation is a flexible job shop containing ten resources aimed at being flexible with regard to product mix and processing types. Computing schedules for this type of job shop is an NP-hard problem. The computation times will therefore always be an issue, especially as the scheduling problem includes limited availability of fixtures and preventive maintenance planning. Computational results show that with the method developed we are able to produce optimal, or near-optimal, schedules for real data instances within an acceptable time frame. The scheduling principle proposed shortens lead times and minimizes tardiness.

Mathematical optimization

Flexible job shop scheduling problem

Production planning

Författare

Karin Thörnblad

Göteborgs universitet

Chalmers, Matematiska vetenskaper

Torgny Almgren

Göteborgs universitet

Chalmers, Matematiska vetenskaper, Matematik

Michael Patriksson

Chalmers, Matematiska vetenskaper, Matematik

Göteborgs universitet

Ann-Brith Strömberg

Chalmers, Matematiska vetenskaper, Matematik

Göteborgs universitet

Proceedings of the 4th World P&OM Conference / 19th International Annual EurOMA Conference, Amsterdam, Netherlands, July 2012

Ämneskategorier

Produktionsteknik, arbetsvetenskap och ergonomi

Beräkningsmatematik

Styrkeområden

Produktion

Fundament

Grundläggande vetenskaper

Mer information

Skapat

2017-10-08