The design of buildings and load carrying structures in early stages is a challenging task for a number of
reasons; scant information generally exists and several different requirements involving building structures
should be managed, including technical, environmental and financial requirements. However, this phase of
the design process is important and will fundamentally influence the following construction phase, as well
as the entire life of building structures. It is particularly important that the construction phase is properly
considered already in the design phase and that the production method selected is suitable for the design
of building structures. The purpose of this research has been to improve the design process in the
conceptual phase. The findings will highlight the benefits of design for production in bridge engineering.
The aim has been to identify examples of practices and work methodologies that are of good caliber in the
Swedish bridge construction sector. Early findings show that there exists a divergence between research
findings and current practices. The research community has presented several participatory methodologies
for the design process, such as Early Contractor Involvement (ECI) and Integrated Project Delivery (IPD) for
the potential of improving effectiveness in bridge engineering. However, studies of current practices in
industry show that these methodologies are difficult to implement and that there are hidden
consequences. The processes developed should manage several requirements simultaneously, including
technical, environmental, health and safety, and financial. Competencies involved include Structural
Engineering, Architecture and Production Management, in addition to expertise in health and safety,
materials science, environmental impact and procurement. Further, the intention is for the processes to
deal with verification methods for the proposed conceptual solutions and risk analyses based on quality
assurance. Both new and existing building structures should be considered.