Measuring and analysing Levels of Automation in assembly systems - For future proactive systems
Licentiatavhandling, 2009
LoA
proactive
assembly system
Level of automation
Författare
Åsa Fasth
Chalmers, Produkt- och produktionsutveckling, Produktionssystem
RELATIONS BETWEEN PARAMETERS/PERFORMERS AND LEVELS OF AUTOMATION
IFAC workshop on manufacturing modeling, management and control, 14-16 November , Budapest, Hungary,;(2007)p. 6-
Paper i proceeding
Characteristic of a Proactive Assembly System
The 41st CIRP Conference on Manufacturing Systems,;(2008)
Paper i proceeding
Measuring and analysing Levels of Automation in an assembly system
The 41st CIRP Conference on Manufacturing Systems, Tokyo japan,;(2008)
Paper i proceeding
Analysing changeability and time parameters due to levels of Automation in an assembly system
Paper i proceeding
Does Levels of Automation need to be changed in an assembly system? - A case study
The 2nd Swedish Production Symposium (SPS), Stockholm, Sweden,;(2008)
Paper i proceeding
Ämneskategorier
Produktionsteknik, arbetsvetenskap och ergonomi
Research series from Chalmers University of Technology, Department of Product and Production Development: report
Konferenslokalen, 3 vån, Eklandagatan 86
Opponent: Universitetslektor Carin Andersson, Lunds Tekniska Högskola