Productivity increase in design and production of bridges
Paper i proceeding, 2024
to be built, it is essential that design and construction could be performed with high productivity. This paper
focuses on how standardisation of bridges can result in higher productivity. A quantitative study was
performed to examine essential parameters that have potential to increase productivity in the Swedish
bridge construction industry; it also examines how standardisation could increase productivity; and how
specific incentives of the three significant actors (contractor, client and design engineer) could be obstacles
to productivity. The main findings are that the actors believe in standardisation as a way to increase
productivity. Reinforcement layout was one important parameter to increase productivity. Contractor’s view
on profit could be an obstacle to productivity. Increased productivity would be more sustainable
infrastructure delivery and here the client has an important role to play.
Productivity
Standardisation
Parameters
Obstacles
Författare
Johan Lagerkvist
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Ola Laedre
Norges teknisk-naturvitenskapelige universitet
Rasmus Rempling
Chalmers, Arkitektur och samhällsbyggnadsteknik, Construction Management
Petra Bosch-Sijtsema
Chalmers, Teknikens ekonomi och organisation, Innovation and R&D Management
Fredrik Carlsson
Trafikverket
Mats Karlsson
Chalmers, Arkitektur och samhällsbyggnadsteknik, Konstruktionsteknik
Construction's Role for a World in Emergency
1268-1276
978-3-85748-204-5 (ISBN)
Manchester, United Kingdom,
Industriell konstruktion, upphandling och produktion av byggnadsverk och andra tekniska detaljer
Trafikverket (2020/65121), 2020-08-01 -- 2025-12-31.
Ämneskategorier
Infrastrukturteknik