In2Track3 - Concluding technical report
Samlingsverk (redaktörskap), 2024
The general Shift2Rail objectives were
• To enhance the existing capacity fulfilling user demand
• To increase the reliability delivering better and consistent quality of service
• To reduce the life cycle cost, increasing competitiveness of the European rail system and the European rail supply industry
In2Track3 addresses these objectives specifically for the track, switches and crossings (S&Cs), and bridge and tunnel assets.
The project, coordinated by Trafikverket, the Swedish Transport Administration, involved 25 project member companies and an additional 14 associated partners from 10 different countries participated in the project. The partners included infrastructure managers, technology developers, research institutes and universities, which provided a wide representation of the railway sector.
This concluding technical reports provides an overview that features 61 examples of research topics and 18 examples of research results demonstrated in operational use. More details can be found in the 22 technical deliverable reports of the project.
Redaktör
Anders Ekberg
Chalmers, Mekanik och maritima vetenskaper, Dynamik
Pernilla Edlund
Driving research and innovation to push Europe's rail system forward (IN2TRACK3)
Europeiska kommissionen (EU) (EC/H2020/101012456), 2021-01-01 -- 2023-12-31.
Trafikverket (2021/19114), 2021-01-01 -- 2023-12-31.
Ämneskategorier
Produktionsteknik, arbetsvetenskap och ergonomi
Teknisk mekanik
Transportteknik och logistik
Infrastrukturteknik
Annan materialteknik
Metallurgi och metalliska material
Drivkrafter
Hållbar utveckling
Innovation och entreprenörskap
Styrkeområden
Transport
ISBN
978-91-8045-358-5
Utgivare
Trafikverket