Design for green lean building module production - Case study
Paper i proceeding, 2018

With an increasing societal need for temporary buildings, while construction industry faces resource and time efficiency challenges, factory assembly of modular buildings can be a solution. This case study at a start-up company uses experiences from assembly system design and eco-design literature to propose green lean design principles to be used in the design and development of building modules and their assembly stations. The eco-design strategy wheel is used as a basis and adapted for the assessment of green and lean building manufacturing.

eco-design

green lean

modular building production

Författare

Martin Kurdve

Chalmers, Teknikens ekonomi och organisation, Supply and Operations Management

Swerea

Jutta Hildenbrand

Swerea

Christina Jönsson

Mälardalens högskola

Swerea

Procedia Manufacturing

2351-9789 (eISSN)

Vol. 25 594-601

8th Swedish Production Symposium, SPS 2018
Stockholm, Sweden,

CiMMREC – Circular models for mixed and multi material recycling in manifacturing extended loops

RISE Research Institutes of Sweden, 2016-08-01 -- 2020-03-01.

CONSTRUCTIVATE. Hur kan hanteringen av bygg- och rivningsavfall förbättras?

Chalmers Industriteknik (CIT) (projekt160026), 2016-04-01 -- 2019-12-31.

Ämneskategorier

Arkitekturteknik

Produktionsteknik, arbetsvetenskap och ergonomi

Design

Styrkeområden

Produktion

DOI

10.1016/j.promfg.2018.06.096

Mer information

Senast uppdaterat

2019-07-09