A data-driven algorithm to predict throughput bottlenecks in a production system based on active periods of the machines
Artikel i vetenskaplig tidskrift, 2018

Smart manufacturing is reshaping the manufacturing industry by boosting the integration of information and communication technologies and manufacturing process. As a result, manufacturing companies generate large volumes of machine data which can be potentially used to make data-driven operational decisions using informative computerized algorithms. In the manufacturing domain, it is well-known that the productivity of a production line is constrained by throughput bottlenecks. The operational dynamics of the production system causes the bottlenecks to shift among the production resources between the production runs. Therefore, prediction of the throughput bottlenecks of future production runs allows the production and maintenance engineers to proactively plan for resources to effectively manage the bottlenecks and achieve higher throughput. This paper proposes an active period based data-driven algorithm to predict throughput bottlenecks in the production system for the future production run from the large sets of machine data. To facilitate the prediction, we employ an auto-regressive integrated moving average (ARIMA) method to predict the active periods of the machine. The novelty of the work is the integration of ARIMA methodology with the data-driven active period technique to develop a bottleneck prediction algorithm. The proposed prediction algorithm is tested on real-world production data from an automotive production line. The bottleneck prediction algorithm is evaluated by treating it as a binary classifier problem and adapted the appropriate evaluation metrics. Furthermore, an attempt is made to determine the amount of past data needed for better forecasting the active periods.

shifting

Real-world

production

smart maintenance

machine learning

Industry 4.0

Predictive analytics

Digitalisation

throughput

managing bottlenecks

Maintenance

smart manufacturing

Bottleneck prediction

ARIMA

active period

constraints

decision-making

bottlenecks

bottleneck

Big data

throughput bottlenecks

prediction

data-driven

Theory of Constraints

Författare

Mukund Subramaniyan

Chalmers, Industri- och materialvetenskap, Produktionssystem

Anders Skoogh

Chalmers, Industri- och materialvetenskap, Produktionssystem

Hans Salomonsson

Chalmers, Data- och informationsteknik, CSE Verksamhetsstöd

Pramod Bangalore

Chalmers, Data- och informationsteknik

Jon Bokrantz

Chalmers, Industri- och materialvetenskap, Produktionssystem

Computers and Industrial Engineering

0360-8352 (ISSN)

Vol. 125 533-544

DAIMP - Dataanalys inom underhållsplanering

VINNOVA (2015-06887), 2016-03-01 -- 2019-02-28.

Ämneskategorier

Produktionsteknik, arbetsvetenskap och ergonomi

Datavetenskap (datalogi)

Datorsystem

Styrkeområden

Produktion

DOI

10.1016/j.cie.2018.04.024

Mer information

Senast uppdaterat

2019-11-10