In2Track
Forskningsprojekt, 2016 – 2020

The main objective of In2Track project is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that have been identified as part of the Shift2Rail Innovation Programme 3. The specific objectives of IN2TRACK are divided into three parts;

  • Enhancing and optimising the switch & crossings and track systems in order to ensure the optimal line usage and capacity
  • Investigating novel ways of extending the life of bridges and tunnel assets through new approaches to maintaining, repairing and upgrading these structures;
  • Development and adoption of a holistic, whole system-approach.

A whole-system approach, which is defined as the system boundaries extending from dynamic wheel-rail interaction (loading input) through to degradation of the S&C system, sub-systems, individual components, and underlying track foundation, will also be at the heart of IN2TRACK on how to reach the objectives.

Deltagare

Anders Ekberg (kontakt)

Chalmers, Mekanik och maritima vetenskaper, Dynamik

Roger Lundén

Chalmers, Mekanik och maritima vetenskaper, Dynamik

Samarbetspartners

Chalmers järnvägsmekanik (CHARMEC)

Gothenburg, Sweden

Trafikverket

Borlänge, Sweden

Finansiering

Europeiska kommissionen (EU)

Projekt-id: EC/H2020/730841
Finansierar Chalmers deltagande under 2016–2020

Trafikverket

Projekt-id: TRV2016/50535
Finansierar Chalmers deltagande under 2016–2019

Relaterade styrkeområden och infrastruktur

Hållbar utveckling

Drivkrafter

Transport

Styrkeområden

Energi

Styrkeområden

Publikationer

2023

Editorial for S&C benchmark special issue

Övrig text i vetenskaplig tidskrift
2022

RAIL AND WHEEL HEALTH MANAGEMENT

Paper i proceeding

Mer information

Projektets webbplats

http://shift2rail.org/in2track/

Senast uppdaterat

2023-05-12